Under Operation

  • ALAKÖPRÜ DAM & HEPP

    ALAKÖPRÜ

    DAM & HEPP

    Total investment cost:  $ 75 million

    Location:   Anamur / Mersin

    Total installed capacity:  32 MW

    Electricity generation capacity: 100 million kWh

    Reservoir volume:  130,000,000 m3

    Tranmission Line Length: 11 Km/ 477 Double Circuit

  • DUMLU HEPP

    DUMLU

    HEPP

    Total investment cost:  5.000.000 USD

    Location:   Dumlu/Erzurum

    Total installed capacity:  4 MW

    Annual production:  7 million  kWh

    Transmission Line Length: 1,050 m

  • KILCAN HEPP

    KILCAN
    HEPP

      Total investment cost:  $ 3.5 million

      Location:   Narlı/Dalaman

      Total installed capacity:  3 MW

      Annual production:  7.5 million kWh

      Transmission Line Length: 1,050 m