ALAKÖPRÜ DAM & HEPP
Under Operation
Total investment cost: $ 75 .000.000
Location: Anamur / Mersin
Total installed capacity: 32 MW
Electricity generation capacity: 100 million kWh
Reservoir volume: 130,000,000 m3
Tranmission Line Length: 11 Km/ 477 Double Circuit
DUMLU HEPP
Under Operation
Total investment cost: $ 5.000.000
Location: Dumlu/Erzurum
Total installed capacity: 4 MW
Annual production: 7 million kWh
Transmission Line Length: 1,050 m
KILCAN HEPP
Under Operation
Total investment cost: $ 3.500.000
Location: Narlı/Dalaman
Total installed capacity: 3 MW
Annual production: 7.5 million kWh
Transmission Line Length: 1,050 m
<
>